[vc_single_image image=”362″]
[vc_empty_space height=”30px”]
SR 300 (SR 283) – Dauphin County (Middletown, PA)
Budget: $ 23 million
- The work consists of the following:
- 3 bridge rehabs (Type 2 repair, new expansion dam installation, new latex bridge decks
- 1 new superstructure with new pre-stressed beams
- 1 new superstructure with new fabricated structural steel beams over the PA Turnpike
- Multiple deck replacements, including 2 bridges over 600 lineal feet.
- 26 sign post foundations including sheeting and shoring.