Skip to content
Cumberland County – Lowther Street over I-83
Budget: $ 7.9 million
- Demolition of the rigid frame structure over I-83 via implosion and accomplished within a four hour time restriction.
- Design/Build of a two lane temporary bridge spanning 150 lineal feet over I-83 and erecting within a 4 hour time restriction.
- Erection of the 2-span Fabricated Structural Steel within a four hour time restriction.
- Construction of the new 2-span structure supported on predrilled H-piling.
Back To Top